
Part No. 4801-5169 Rev 12-07 Rollup Curtain System Page 20
10. End Pocket installation
The End Pockets are 12' in length and must be cut to the length of the total system.
1. Cut End Pockets to the desired length.
1. Fasten C-channel to brackets with sheet metal screws to form C-channel assembly. Repeat for top C-channel,
middle C-channel, and bottom C-channel assemblies. NOTE: Be sure to use End Pocket Spreader Bracket.
2. Attach the top and bottom Spreader Bars with sheet metal screws.
3. Attach End Pocket with sheet metal screws through the flange on the end of the End Pocket.
4. Attach the front of the Spreader bars with sheet metal screws.
11. Insert Vent Bolt
Locate the Vent Bolt in the Vinyl seal under the motor
cover plate. See Figure 16. Remove the bolt in the top
of the gear box and insert the Vent Screw. See Figure
12.
Sheet Metal
Screws
End Pocket
Optional
C-Channel fo
High Wind Use
Spreader bar
(Attach back with
sheet metal screws
Spreader bar (Attach
back with sheet metal
screws)
Figure 11
Figure 12 – Insert Vent Bolt
Remove bolt for Vent
Bolt
Komentarze do niniejszej Instrukcji